RP3.4-03B: Understanding damage to pipeline due to HDD equipment – Phase 2
Executive Summary | This research project is the second phase of a program to establish a Centre of Excellence for External Interference and Pipeline Damage Assessment due to third party intrusion. This project will provide an empirically based methodology for pipeline engineers to assess the potential damage to pipelines due to HDD impacts using the HDD rig that was developped through the first phase of the program (RP3.4-03) . The methodology aims to be generally consistent with the approach used to assess excavator impacts to facilitate uptake within the pipeline industry. It also will be consistent with the requirements and approaches adopted in AS 2885.1 and AS 2885.6. |
Login | Full project details are available to participants of the CRC, please login or contact us to create your account. |
Commencement / End Date | July 2021 to June 2022 |
Outcomes / Impact | The methodology would be made available for use within the industry, in the same manner that the excavator resistance to penetration method is currently used by the industry. The users of the developed methodology would be:
|
Partners | University of Wollongong, Asset Engineering Solutions, Jemena, APA, Beach Energy, Spiecapag/ HDI Lucas |
Research Contact | Douglas Proud Research & Utilisation Program Coordinator |